Skip to content Skip to footer

CONSTRUCTION METHODOLOGY REVIEW

Reviewing concrete floor construction methods aims to ensure that the process is carried out using correct techniques and safety measures and achieves high-quality standards.

The scope of work includes at least the following items:

  • Pre-pour meeting agenda.
  • Define Building Owner expectations
  • Pour size, program and placement requirement.
  • Program and sequence.
  • Pour prep and placement.
  • Sub-base layer.
  • Polythene membrane.
  • Reinforcement.
  • Formwork & jointing systems.
  • Concrete placing sequence (all steps in the process).
  • To include application of dry shake (if proposed).
  • Finishing.
  • Initial Pass with walk-behind trowels.
  • Panning and troweling with ride-on trowels.
  • Edge troweling.
  • Curing.
  • Floor flatness requirements & measurement.
  • Quality assurance.

Reviewing the concrete floor’s construction methods helps ensure that the process runs smoothly, meets quality standards, and is carried out safely. Thorough consulting and supervision help prevent incidents, reduce costs and time, and ensure that the project meets technical requirements.